Missing Line
Resultant bearing & distance from vectors
New Job Note

Add Mark
Saved Jobs

No jobs saved yet.

Coordinates
Traverse Legs
Point 1 — From
Point 2 — To
Start Point
Legs
Radiation
Pt 1
Method
Add Reading
Levelling Book
Point BS IS FS HI Rise Fall RL Adj. RL
Baseline Definition
Offset Points
Point IDChainageOffset (L−, R+)
JOB
Project Manholes
Manhole Setup
Pipe Measurements
Known Values

Enter Radius plus either Delta or Arc Length — the other will be calculated.

Curve Geometry
Δ PC PI PT T T LC M R PC/PT — Tangent points PI — Intersection point LC — Long chord M — Mid-ordinate E
PC Point & Alignment
Set-Out Options
Point 1 & Bearing 1
Point 2 & Bearing 2
Point 1 (Bearing From)
Point 2 (Distance From)
Point 1 & Distance 1
Point 2 & Distance 2

Enter bearings in D.MS format (e.g. 90.2030)

N S W E
Bearing 1
Bearing 2
Half Angle
Input Vectors
# Links (li) Meters (m)

1 link = 0.201168 m · Enter to add row

Tolerance "
Reference Marks
Survey class:
ZM = survey mark · PEG = peg/boundary point
Import from TBC Inverse Report
Copy rows directly from the TBC inverse report (tab-separated). Columns used: From, To, Ellipsoid Distance (col 4), Grid Azimuth (col 5).